+86 17704054161 amjus3@amjwindows.com

AMJ Windows and Doors
  • Home
  • ABOUT AMJ
  • Products
    • AMJ Windows
      • Hung Window
      • Awning Window
      • Casement Window
      • Sliding Window
      • Tilt&Turn Window
      • Bi-fold Window
      • Coner Window
      • Louver
      • Skylight
    • AMJ Doors
      • Sliding Door
      • Casement Door
      • Bi-fold Door
      • Lift-Sliding Door
      • French Door
      • Pivot Door
  • Projects
  • Resoures
    • AMJ News
    • Inspiration
  • CONTACT AMJ

Resoures

  1. Home
  2. Resoures
  3. How to Measure for a Window Quote (Witho...

How to Measure for a Window Quote (Without Being 20 mm Wrong)

There are two ways to buy windows.

The first: a supplier sends someone out, measures carefully, and takes responsibility for the numbers. The second: you measure, you send the numbers, and every millimetre becomes your problem.

Both are legitimate. But if you're doing it yourself — because you're renovating, because you're 400 km from the nearest showroom, or because you're a builder pricing a job — then the difference between a smooth install and a very expensive conversation with a carpenter comes down to about fifteen minutes of care.

Here's how to do it properly.

First, decide which measurement you actually need

This is where most mistakes begin, and it has nothing to do with the tape measure.

Replacement into an existing frame (retrofit). The old sashes come out, the new window goes into the existing aluminium or timber frame. You're measuring the frame opening, and your supplier will build to suit. Cheapest, fastest, and the reveal is untouched.

Full replacement (brick to brick). The entire old window including frame comes out. You're measuring the structural opening — the actual hole in the wall — and the new window is made slightly smaller to allow packing and sealing.

New opening / new build. Same as above, but you also need to confirm the opening is square and plumb, because nobody has fitted a window there yet to hide the problem.

Tell your supplier which of the three you're doing. If you don't, they'll assume, and they'll assume wrong.

The difference between the opening and the window

A window is never made to the exact size of the opening. It has to be smaller, so it can be packed, levelled, squared and sealed.

As a rule of thumb, allow roughly 10 mm total clearance on each dimension — about 5 mm per side — with the gap closed by packers and a continuous sealant or expanding foam bead. Your supplier sets the exact deduction based on their frame profile, the fixing method and the façade, and they should state it in writing on the quote.

Two consequences:

  • If you measure the opening, say so explicitly. "Opening 1200 × 1500, brick veneer, deduct per your standard."
  • Never measure the old window's outer frame and call it the opening. The old frame is inside the opening and there's a gap behind it you can't see. This is the single most common cause of a window arriving 15–20 mm too small.

Measure like the opening is out to get you

Openings are rarely square, rarely plumb, and rarely the size the plan says. Measure as if you expect to be lied to — because the wall will.

Width: measure at the top, the middle and the bottom. Height: measure at the left, the middle and the right. Take the smallest number in each direction. That's your opening. If the three readings differ by more than about 10 mm, the opening is out of square and you should flag it before ordering rather than after.

Diagonals: measure corner to corner both ways. A difference of more than about 5 mm means the opening is racked. A rectangular window will not fit a parallelogram, no matter how carefully it's packed.

Then measure the things nobody remembers until installation day:

What to check

Why

Reveal depth

A deep reveal may need an extension jamb or a sub-sill

Sill height from finished floor

Doors, steps and balustrade compliance all depend on it

Finished floor level (tiles, screed)

Order before the floor goes down and you may lose 20 mm

Head clearance

Roller shutters, blinds, curtain tracks, air-conditioning

Wall type and thickness

Brick veneer, double brick, rendered, timber frame, AAC panel

Fixing zones

No studs where you need them means a structural fix

Handing

Which side the hinge or the sliding panel is on — and state the viewing direction

Access

Floor level, crane, narrow driveway, stairs, lift size

That last one looks like logistics. It's money. A 3.6 m stacker door that has to go up two flights of stairs is a different project from one that slides in off a truck.

Handing: the 50/50 coin flip that costs a month

"Left-hand opening" means nothing on its own. Left when viewed from outside, or from inside? In Australia the convention is usually viewed from outside; in North America it's often viewed from inside. Suppliers in different markets genuinely disagree.

So don't use the word. Draw it. Mark the hinge side on a photo or a sketch and write "viewed from outside" next to it. A thirty-second sketch beats a three-week remake.

The same applies to sliding panels: mark which panel slides, which is fixed, and which way it travels. For a corner or a stacker, mark the stacking direction — where the panels pile up when open.

Take photos, and put the tape in them

Two photos per opening:

  1. A wide shot showing the whole wall, the floor and the ceiling — enough context to judge the situation.
  1. A close-up with the tape measure reading visible in the frame.

Then write on the plan or in the email: the opening number, the room name, the orientation (north/east/south/west), and anything odd — "brick spalled at head", "old air-con hole to be patched", "neighbour's carport 1.2 m away".

Suppliers can work with ugly. They can't work with silent.

The six numbers that decide the price

When you send an enquiry, these six items determine the number that comes back. Leave any of them out and you'll get either a guess or a range:

  1. Width and height (opening or frame — say which)
  1. Quantity, and the schedule (which size goes where)
  1. Glass specification (e.g. 5+12A+5 Low-E Argon, laminated where required)
  1. Finish (standard powder coat colour or a custom one; anodised; timber-look)
  1. Configuration (fixed, awning, casement, sliding, stacker, hinged, louvre — and handing)
  1. Access and delivery (site address, floor level, crane required, date)

Add performance requirements if the project has them — BAL rating, cyclonic region, acoustic target, energy compliance — because those change the glass, the frame and occasionally the whole system.

Five mistakes that cost real money

  • Measuring the old frame instead of the opening.
  • Taking one width reading and assuming the rest match.
  • Forgetting the floor finish thickness on a door.
  • Not flagging an out-of-square opening until the installer arrives.
  • Ordering on a plan dimension instead of a site measurement.

None of these are exotic. All of them are normal. They're also all avoidable with a pencil and a second pair of eyes.

Send us the drawings instead

If you'd rather not do any of this, that's what we're for. Send a plan, an elevation, or a wall of phone photos with a tape in them — AMJ's team will produce a window schedule and a take-off for you, and tell you where the drawing and the site disagree.

Send your plans for a take-off →

FAQ

Do I measure the opening or the window? Measure the structural opening (brick to brick) and tell your supplier that's what it is. They will apply their own deduction for clearance, packing and sealing.

What if my three width readings are different? Use the smallest. If the spread is over about 10 mm, the opening is out of square — raise it before ordering, because the window will be rectangular whether the wall is or not.

Can I measure a window I can't reach? Not reliably. Use a laser measure with a target plate, or get someone on a ladder with a second person recording. Estimating from a photo is how people end up with a window that doesn't fit.

Related News

Protect Your Home and Add Curb Appeal with a Modern Front Door

Protect Your Home and Add Curb Appeal with a Modern Front Do

Same Window, Two Quotes, 40% Apart: Where the Money Actually Goes

Same Window, Two Quotes, 40% Apart: Where the Money Actually

Windows Replacement: It's not diffcult

Windows Replacement: It's not diffcult

Create a Bold Exterior with New Matte Black Cool Color

Create a Bold Exterior with New Matte Black Cool Color

Decoding the Glass Label: What

Decoding the Glass Label: What "5+12A+5 Low-E Argon" Is Actu

How To Order at AMJ Windows?

How To Order at AMJ Windows?

Product Categories

  • AMJ Windows
    • Hung Window
    • Awning Window
    • Casement Window
    • Sliding Window
    • Tilt&Turn Window
    • Bi-fold Window
    • Coner Window
    • Louver
    • Skylight
  • AMJ Doors
    • Sliding Door
    • Casement Door
    • Bi-fold Door
    • Lift-Sliding Door
    • French Door
    • Pivot Door

Links

AMJ FacebookAMJ Instagram

内页左侧广告1

LatestPost

  • The Best Guide To Choose Aluminum Awning Windows
    The Best Guide To Choose Aluminum Awning
    2025-04-14
  • How does glazing doors differ from regular glass doors?
    How does glazing doors differ from regul
    2025-04-10
  • Smart Technology Integration for Sustainability
    Smart Technology Integration for Sustain
    2025-03-20

GET A QUOTE

Contact Us

  • WhatsApp

    8617704054161

  • Phone

    +86 17704054161

  • Email

    amjus3@amjwindows.com

  • Address

    B5, Xingye Yuan, Leping Town, Sanshui District, Foshan, China.

WhatsApp QR Code

WhatsApp QR Code

Scan to chat with us on WhatsApp

Copyright 2026 AMJ Windows & Doors | AMJ Building Group

  • E-mail
  • Whatsapp
  • Inquiry
Inquiry Us Now !
Inquiry Us Now !